- Hygiene & Cleaning
- Translated with AI
Faster at the goal
Design, engineering, manufacturing and start-up of a Pharmawassersystems become the lengthy process, if itself in particular the complete qualification phase (IQ, OQ)� between manufacturers and clients as stored step the lying close installation attaches. Up to the actual release of the Pharmawassers for production after the PQ can often offense here up to 12 months. A vorqualifziertes Pharmawassersystem, implemented as Package unit, is already submitted to the individual test units in detailed steps in the manufacturer: After final Designs Qualification with the client and manufacturing of the plant preferred test units of the installation Qualification e.g. take place like signal test, material testing, examination of the entire documentation and certificates in the context of the FAT. Werner issues a compact, before-qualified Package unit on the Technopharm 2011: A Pharmawassersystem for the processing of PW Purified Water 400l/h with the following technical features: Reject system� - Saving of up to 50% ProzesswasserTSplus module -�� �Thermal Sanitisierung with 85 �CHigh Puritiy -�� �Execution in high-grade steel � orbital orbitalweld-welding those Vorqualifizierung the Package unit makes possible a substantially faster operation Qualification and performance Qualfication with the client and thus for smooth production starting picture: Faster at the goal � sample course in the PQ-phase of a Pharmawassersystems
This text was translated automatically.
![]()
EnviroFALK PharmaWaterSystems GmbH
Maybachstraße 29
51381 Leverkusen
Germany
Phone: +49 2171 7675 0
email: info@envirofalk-pharma.com
Internet: http://www.envirofalk-pharma.com








