Here you can find the NEWSLETTER archive More ...
HJM ClearClean C-Tec PPS

cleanroom online
Deutsch   English



BOY showcases a new injection moulding and spray blowing combination on a BOY 60 E

Abbildung des Spritzblaswerkzeuges / Illustration of the injection moulding tool
Abbildung des Spritzblaswerkzeuges / Illustration of the injection moulding tool
Bild von Vorformling und fertig aufgeblasener Augentropfenflasche / Illustration of the preform and fully blown eye drop bottle
Bild von Vorformling und fertig aufgeblasener Augentropfenflasche / Illustration of the preform and fully blown eye drop bottle

Whereas injection moulding and spray blowing processes were used on different machine designs up to now, BOY now combines both processes on a BOY injection moulding machine at K 2016. Small bottles for eye drops are produced on the clean-room design of the BOY 60 E on Stand A 43 in Hall 13.

In the first step, four preforms are injection moulded, rotated 180 degrees around an index plate and then inflated with compressed air to produce the finished bottle contour in the same mould provided by Schreck Kunststofftechnik GmbH. The finished eye drop bottles are packaged directly after demoulding in the clean mould area of the clamping unit and carried off by a conveyor belt.

Spray blowing on an injection moulding machine is suitable for smaller hollow bodies, such as cosmetics, food or pharmaceutical bottles. The cost of the production machine – in this case a BOY injection moulding machine – is significantly below the cost of a pure injection moulding machine. One benefit of spray blowing is the possibility of manufacturing even more complex contours at the bottle neck extremely precisely, which is only possible to a limited extent in traditional blow mould processes.

Using a manifold system developed specifically for this application by Heitec Heißkanaltechnik GmbH, the preforms are injected without sprue so that no waste is produced in bottle production. Unlike with blow moulds, the bottle is finished at the end of the blowing process. No material used to seal the mould body needs to be cut and removed.


Further information


Dr. Boy GmbH & Co. KG
53577 Neustadt-Fernthal
Germany


Better informed: With YEARBOOK, NEWSLETTER, NEWSFLASH and EXPERT DIRECTORY

Stay up to date and subscribe to our monthly eMail-NEWSLETTER and our NEWSFLASH. Get additional information about what is happening in the world of cleanrooms with our printed YEARBOOK. And find out who the cleanroom EXPERTS are with our directory.

Ecolab PMS MT-Messtechnik ASYS