Hier finden Sie das NEWSLETTER Archiv Mehr ...
ClearClean ASYS Ecolab Buchta

reinraum online
Deutsch   English


  • Datum:
  • Webinar

Annex 1 Intensive Training Course - Live Online Training

Veranstaltungsort:
online
Veranstalter:
CONCEPT HEIDELBERG GmbH
Future Sterile Manufacturing – some Thoughts about the Annex 1 Changes

Contamination Control Strategy - Inspector‘s View on an Overarching Strategy
  • Requirements
  • Expectations & interpretations
The ECA CCS Guide – a Brief Overview
  • Guide scope and purpose
  • Structure & content overview
Structure and Design – Practical Aspects for a CCS
  • How to develop the strategy
  • How to have your documents available and accessible
Aseptic Process Simulation – Annex 1 Requirements
  • Requirements
  • Expectations & interpretations
Sterile Filtration & Container Closure - Annex 1 Requirements
  • Sterile filtration requirements
  • Pre-Use-Post-Sterilization-Integrity-Testing (PUPSIT) of sterile filters
  • Container Closure Integrity Testing (CCIT
  • Visual inspection process
PUPSIT – Annex 1 - Application of Risk Management
  • PUPSIT: Risk Assessment for PUPSIT and considerations of associated risks in established processes
CCIT – In the Light of the New Annex 1
  • Changed requirements for CCIT in finishing of sterile products
  • Holistic and more scientific view on CCI system as now multiple influencing aspects are explicitly addressed
Disinfection – Efficacy Testing and Validation
  • Antimicrobial agents and their efficacy
  • Testing methods
  • Efficacy testing against Isolates
  • Validation approach
QRM in Sterile Manufacturing – Industrial Experience
  • Strengths and limitations of an EM program
  • Trending: detecting changes
  • Use of modern technologies
  • Response to level excursions
Annex1 vs. ISO 14644-1
Requirements from a Technical Point of View
  • Accordance and differences
  • The issue with the particle sizes
  • Qualification challenges
Enhanced Requirements on Facilities and Utilities
  •  Utilities: water, steam and gases
  •  Facilities: airlocks and pass boxes ; insertion of barrier technologies
  •  Implicit requirements
 Authorities‘ Point of View on RABS and Isolators
  •  Requirements for barrier systems in new Annex
  •  Major changes compared to previous Version (Annex 1, 2008)
  •  Inspector‘s comments on changed requirements
Personnel - Behaviour and Access into Cleanrooms
  • Requirements for personnel in new Annex 1
  • Developments since version 2008 of Annex 1
  • Comments of inspector on implementation
New Requirements on a Cleanroom Garment System as an Essential Element of the Contamination
  • Control strategy
  • The ‚new‘ Annex 1
  • Contamination control strategy for garments
  • Risk management
Environmental Monitoring – Current Methodology and Experiences
  • Strengths and limitations of an EM program
  • Trending: detecting changes
  • Use of modern technologies
  • Response to level excursions
Environmental & Process Monitoring - Inspector´s View
  • Summary of requirements from entire Annex 1
  • Essentials for inspection
Comparison of Annex 1 with other Relevant Documents


Concept-Heidelberg
CONCEPT HEIDELBERG GmbH
Rischerstraße 8
69123 Heidelberg
Deutschland
Telefon: +49 6221 844415
Telefax: +49 6221 844464
eMail: info@concept-heidelberg.de
Internet: http://www.gmp-navigator.com/

Besser informiert: Mit JAHRBUCH, NEWSLETTER, NEWSFLASH und EXPERTEN VERZEICHNIS

Bleiben Sie auf dem Laufenden und abonnieren Sie unseren monatlichen eMail-NEWSLETTER und unseren NEWSFLASH. Lassen Sie sich zusätzlich mit unserem gedruckten JAHRBUCH darüber informieren, was in der Welt der Reinräume passiert. Und erfahren Sie mit unserem Verzeichnis, wer die EXPERTEN im Reinraum sind.

PPS MT-Messtechnik Becker Vaisala